Online Production

STAGES OF PRODUCTION
  FIRST STAGE

The work orders are processed, optimized and sent online to cnc machines in production

  SECOND STAGE

The work order is forwarded online  to “precut centre” where cut processing and profile labeling by barcodes are performed

  THIRD STAGE

After cutting to profiles a galvanized steel reinforcement is installed. Profiles are sent to “processing centre”  where they are recognized by barcode readers and are submitted to scheduled processes: reinforcing, drainage, preparation for studding...

  FOURTH STAGE

Upon completed processing by “ processing centre” profiles are placed to “four-headed welding machine” where precise joining-welding of 0,2mm profiles is performed

  FIFTH STAGE

After welding, the frame is cooled (30 sec) and automatically sent to “cleaning machine” which performs the cleaning of the weld

  SIXTH STAGE

The frame is then placed on the reinforcing machine where it is properly studded

  SEVENTH STAGE

After studding the window is placed in a special pneumatic press where final control and glazing are performed

  EIGHTH STAGE

After final control the ready carpentry is sorted to pallets and is ready for delivery or installing 

 

Kalkulator uštede

Saving calculator

See for yourself how much you can save by replacing your old carpentry with the new PVC carpentry

Kalkulator uštede

Entrance door configurator

See how the new door will fit your house/flat.

Kalkulator uštede

Colour configurator

See how the new windows and doors will fit your house/flat.

Kalkulator uštede

Product catalogue

Browse our catalogue